First Build!

The development had their first Build session on 11/17/12 at the Albus Cavus workshop. We picked up a utility trailer a few weeks before and now need to prepare it for the mini [ ] Box (see previous post for more info). The team was able to cut the steel tubes into the correct lengths and start to weld them onto the frame.

Agustina, Patrick, & Peter discussing changes to the design.

Peter with the welding torch.

This entry was posted in Uncategorized. Bookmark the permalink.